Do you need a permit?
Almost always, yes — if the work involves plumbing changes, which nearly every shower remodel does. Moving a drain, changing a valve, or altering supply lines triggers a plumbing permit in every Florida city and county we work in.
Purely cosmetic work (re-caulking, replacing a showerhead on the existing arm) typically doesn't need one. But the moment pipes move or get replaced, you're in permit territory.
What gets inspected
Rough-in inspection. After demo and plumbing rough-in but before walls close. The inspector checks pipe sizing, slope, venting, and pressure-tests the supply lines. This is the important one — it catches problems while they're still fixable.
Final inspection. After everything's done. The inspector checks the finished shower: fixtures work, no leaks, proper clearances, and that the work matches the permitted plans.
Some jurisdictions also want to see the shower pan flood test documented. We flood-test every pan regardless — it's our standard, not just a code checkbox.
Timelines
Permit issuance in most Gulf Coast cities takes 3–10 business days for a straightforward shower remodel. Inspections are usually scheduled 1–2 days out. We build this into the project schedule — it's not a surprise delay, it's part of the plan.
HOA communities (condos especially) may have their own approval process on top of the city permit. Water shutoff coordination, elevator reservations for material delivery, work-hour restrictions — we handle the logistics.
What happens if you skip the permit
- Resale problems. Unpermitted work shows up in buyer inspections and can kill deals or trigger retroactive permitting at much higher cost.
- Insurance issues. If an unpermitted shower leaks and damages the home, your insurer can deny the claim.
- Stop-work orders. A neighbor complaint or routine drive-by can shut the job down mid-project.
- No recourse. If an unpermitted installer does bad work, you have little leverage — the contract was for illegal work.
Who handles it
We do. Permit applications, plan submissions, inspection scheduling — it's part of our service, included in the quote. You don't fill out forms or wait on hold with the building department.
When comparing quotes, ask every contractor: "Do you pull permits?" Anyone who says you don't need one for a shower remodel with plumbing changes is either misinformed or cutting corners. Either way, it's a red flag. Call (407) 434-9297 — we do this right.